+
Client
Links of London
+
Project Duration
May 2021 – July 2021
+
Project Size
987 SF
+
Components
- Flooring
- Millwork
- Architectural Lighting
- AV, LV, FS & FA
- Detailed trim work and coffered ceilings
Overview
Harris Associates provided Preconstruction and General Contracting Services for the Links of London store. Construction was completed at night to minimize disruptions to the tenants operating above and below.
Millwork/Casework was provided by a fabricator in Romania, and Harris Associates supervised the Romanian install.
Testimonials
No items found.
Previous post
There is no previous post
Back to all postsNext post
There is no next post
Back to all posts